24 Sep Pressure test of irrigation system in Eagleby
This morning we attended to check the integrity of a recently installed irrigation system in a council reserve by an independent contractor. We tested the line which ran several hundred metres from the main water supply shut off valve to the shut off valve adjacent to the rain water collection tank. This line held pressure at 800kpa confirming the line is currently secure. A written report was provided to our client
Sorry, the comment form is closed at this time.